A selection of work across technology deployment, infrastructure delivery and market-facing engagements.
Focused on reducing uncertainty before decisions are made and maintaining control during execution.
Selected examples include work delivered by Rivium and prior roles where the founder held lead responsibility for execution and technical decisions.
A proposed long-distance sewage pumping and sub-sea transfer system involved significant capital exposure, with uncertainty across hydraulic design, routing and long-term operational performance.
Led early-stage hydraulic analysis and concept evaluation, combined with techno-commercial assessment of CAPEX and OPEX. Identified key technical constraints and cost drivers affecting feasibility.
Revealed that the proposed solution was not economically or operationally viable, avoiding €40–45M high-risk capital commitment.
A wastewater technology transitioning from pilot to its first full-scale reference faced unclear integration with existing infrastructure and significant operational uncertainty.
Led technical delivery of the full-scale demonstration, aligning process & mechanical design, R&D, engineering and operations. Established structured root cause analyses and learning cycles to resolve issues and stabilise performance under real conditions.
Full-scale reference plant delivered within 8 months. Improved operational stability and reduced uncertainty ahead of further deployment.
A mid-sized total water solutions provider entering Europe without clear positioning, target segments, or partner strategy.
Defined market focus, refined value proposition and structured a practical go-to-market approach aligned with regulatory, geographic and commercial realities.
Clear entry pathway with focused targets, revenue streams and reduced commercial risk in early-stage expansion.
A water technology provider delivering its first reference project in a new market faced uncertainty around membrane selection, performance and cost structure, with limited visibility into EPC and supplier delivery efficiency.
Undertook a focused early-stage assessment of delivery workflows, supplier interfaces and decision points. Identified coordination gaps, hidden cost drivers and structural inefficiencies across the EPC and supply chain.
Improved clarity on membrane and supplier decisions and overall cost structure. Identified opportunities to reduce hidden costs and supply-chain friction ahead of scaling, with potential cost improvements of approximately 25%.
Complex infrastructure projects in water, urban energy, and transportation systems that were exposed to stakeholder pressure, technical coordination challenges and risk of design drift in execution.
Supported business development from proposal through award, including contribution to tender strategy and contract discussions. Led multidisciplinary delivery with clear interface management, structured decision-making and execution discipline across design and implementation phases.
Projects secured and delivered on schedule with stable design quality, maintaining control across both commercial and execution phases.
Large-scale treatment plants exposed to hydraulic and operational risks affecting long-term performance.
Performed comprehensive hydraulic design reviews, hydraulic analysis and studies, and start-up phase troubleshooting under EPC delivery conditions.
Improved design robustness and operational reliability before commissioning.
Most work is delivered under confidentiality.
Further detail can be shared in a focused discussion.